Additional Information

 

To assist with our virtual consultation, we have created this page as a means for interested stakeholders to obtain all information in which they may require in order to provide feedback on the three options being presented during our September 2020 consultation events. We also understand that there are limitations to online consultation, and therefore we will also be available to engage via email, telephone and online meeting where required, to ensure we reach stakeholders in a manner most suitable to them. If those with poor internet connection wish to contact us, we can email or post hard copies of any of the materials available to download below and respond to any specific questions or stakeholders may have. 

Project Map

 

Poster, Booklet and Consultation Boards

Creag Dhubh to Dalmally - Virtual Consultation Poster - Aug 2020
File Type: pdf
Published: 12 Aug 2020
Virtual Consultation Boards - September 2020

Related Projects: Creag Dhubh - Dalmally 275kV Connection

File Type: pdf
Published: 28 Aug 2020
Consultation Booklet - September 2020
File Type: pdf
Published: 17 Aug 2020

Consultation Document

Creag Dhubh to Dalmally 275kV Connection - Consultation Document 2020

Related Projects: Creag Dhubh - Dalmally 275kV Connection

File Type: pdf
Published: 31 Aug 2020

Maps

Option 1 Map - September 2020

Related Projects: Creag Dhubh - Dalmally 275kV Connection

File Type: pdf
Published: 28 Aug 2020
Option 2 Map - September 2020
File Type: pdf
Published: 28 Aug 2020
Option 3 Map - September 2020

Related Projects: Creag Dhubh - Dalmally 275kV Connection

File Type: pdf
Published: 28 Aug 2020
Project Overview Map (All Options) - September 2020
File Type: pdf
Published: 28 Aug 2020
Feedback Form

 

Project Contacts

Kelly Scott
  • Title: Community Liaison Manager
  • Email: kelly.scott@sse.com
  • Mobile: 07443 772 946
  • Address: Networks
    1 Waterloo Street
    Glasgow
    G2 6AY
Grace Campbell
  • Title: Land Manager
  • Email: grace.campbell@sse.com
  • Address: Scottish Hydro Electric Transmission Plc
    Inveralmond House
    200 Dunkeld Road
    Perth
    PH1 3AQ

The videos showing the content of the 3D model and providing viewpoints and an overview of the Option 1 route alignment were created in 2018 following public consultation. The 3D model itself was presented during the 2018 consultation. As the decision was made shortly thereafter to carry out further study in to undergrounding (Option 2) and an alternative solution (Option 3), it was considered that these may not be applicable to share at that time. We are sharing these now in order to provide further detail in regards to the visual appearance of Option 1 and the Creag Dhubh Substation.