To allow us to complete our assessment and confirm our assumptions, we would be grateful to receive your feedback.
The closing date for this feedback form has passed.

We are currently in the early stages of preparing for the next transmission price control (RIIO-T2) which will cover the eight-year period between 2021 and 2029. As part of this work, we have been reviewing our assumptions concerning onshore wind farm repowering and those used within the Future Energy Scenarios developed by the GB System Operator. We are now looking for feedback to confirm our assumptions ahead of progressing to a final position.

The full report can be viewed and downloaded here.