Overview
About the Project
The project involves a series of upgrades to the existing electricity transmission infrastructure between Tealing and Lunanhead substations.
The works will include installing four new protection bays, with two at each end of the connection between Tealing and Lunanhead. Protection equipment plays an important role in monitoring the electricity network and helping to safely isolate equipment if a fault occurs.
We will also install new electrical equipment on both circuits, including two capacitor voltage transformers (CVTs) and two surge arresters. CVTs are used to measure voltage on the network, while surge arresters help protect equipment from sudden increases in voltage.
As part of the upgrade, we will replace the existing battery systems and low voltage alternating current (LVAC) board. These systems provide power for the equipment used to operate and control the substation. A standby generator will also be provided as a back-up source of power.
We will also upgrade the communications links between Lunanhead 132/33kV Grid Supply Point (GSP) substation and Tealing 132/33kV substation. These communication systems allow information to be exchanged between the substations and support the monitoring, control and protection of the electricity network.
Together, these works will upgrade key equipment and supporting systems associated with the existing connection between Tealing and Lunanhead.

Why is the Project Required?
We have a licence obligation to invest in our existing assets to maintain network health and condition. We also have a statutory duty under the Electricity Safety Quality and Continuity Regulations 2002 to ensure that the electricity transmission network is fit for purpose.
Also as part of our statutory and Transmission Licence obligations, we have a number of duties including:
- the development and maintenance of an efficient, coordinated and economical system of electricity transmission
- to facilitate competition in the supply and generation of electricity
- to ensure that the security of the network is maintained as the demand and/or generation connections change over time

Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.

How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.