Salamander 132kV overhead line alignment selection (and associated tee compound) consultation event

Peterhead

  • Time:

    -
  • Location:

    Peterhead Football Club, Balmoor Stadium, Balmoor Terrace, Peterhead, AB42 1EQ
  • Local authorities:

    Aberdeenshire
  • Related projects:

  • Category:

    Consultation, Information

You are invited to attend our 132kV overhead line alignment selection (and associated tee compound) consultation event:

Tuesday 24 March 2026, 3–7pm
Peterhead Football Club, Balmoor Stadium,
Balmoor Terrace, Peterhead, AB42 1EQ

The overhead line is required to connect the Salamander Offshore Wind Farm to our existing network. At the event, we will share alignment options and associated tee compound location, as well as our potential alignment.

We are seeking feedback from the community and stakeholders, and we invite comments until 5 May 2026 when the feedback period will close.

The proposed overhead line and associated tee compound are required to connect the Salamander Offshore Wind Farm to our transmission network. The alignments being considered are in an area between Peterhead and St Fergus. Visit our webpage for more detailed maps.