Search results
displaying 801 - 808 of 1285 results found for 'search for '
-
Coire Glas Connection Project Proposed Loch Lundie substation, Coire Glas switching station and 400kV overhead line connection
Projects
Events
SSEN Transmission invite you to come along to these public feedback events for the Coire Glas Connection project. This Connection project is required to connect the Coire Glas Pumped Hydro Scheme and comprises a new 400kV Loch Lundie substation, a new 400kV Coire Glas switching station and a 400kV double circuit overhead line element. This is the final drop-in event
-
Stannergate 132kV Substation and Network Rail Feeder Station
Projects
SSEN Transmission are developing proposals to replace and upgrade Dundee’s high voltage electricity network. Now approaching 60 years of service, many of the Transmission assets in Dundee have either exceeded or are nearing the end of their economic and operational capability. We are therefore consulting on proposals to build a new 132kV substation in the Stannergate area (near Dundee Harbor). This site will provide a location to replace the existing Dudhope substation, which helps provides power to Dundee. In addition, our proposals for this project include a new 132kV feeder station to support Network Rail’s ambitions to electrify the rail network within Scotland’s Central Belt.
-
Beauly - Blackhillock - New Deer - Peterhead (Turriff Event)
Consultation
Beauly - Blackhillock - New Deer - Peterhead Public Consultation event for overhead line routeing
-
Beauly - Blackhillock - New Deer - Peterhead (Huntly Event)
Projects
Beauly - Blackhillock - New Deer - Peterhead Public Consultation event for overhead line routeing
-
Beauly - Blackhillock - New Deer - Peterhead – Beauly - Blackhillock - New Deer - Peterhead (Beauly Event)
Projects
Events
Beauly - Blackhillock - New Deer - Peterhead Public Consultation event for overhead line routeing
-
Innovation
Innovation
SSEN Transmission’s innovation purpose is to deliver a reliable and resilient network safer, smarter, greener, and faster. Today’s energy landscape is fast-changing and is constantly evolving to support the transition to net zero by 2050. Innovation has a critical role to play in delivering our future network whilst continuing to deliver network reliability and value for our customers. At SSEN Transmission, we actively seek to improve our understanding of the challenges facing the GB transmission network and find new ways to overcome these challenges. We are collaborating with our customers, stakeholders, industry innovators, and other transmission owners (TOs) to share ideas, research new concepts for our network, and maximise the value and benefits of pioneering technologies.
-
ASTI Hub North office opens in Thurso - creating up to 50 new skilled jobs in local area
-
SSEN Transmission submits Banniskirk Hub planning application to The Highland Council
SSEN Transmission has submitted a planning application to The Highland Council for a new 400kV substation and high voltage direct current (HVDC) converter station in the Spittal area, known as the Banniskirk Hub.
Page 101 of 161
