Search results
displaying 201 - 208 of 1285 results found for 'search for '
-
Spring clean for primary school thanks to Lochay substation transformer project
-
Eastern Green Link 2 Peterhead Local Fund to deliver over £2 million for local communities
Communities in Peterhead and the surrounding area will benefit from over £2 million in funding for local initiatives, through a new community benefit fund delivered as part of the UK’s biggest ever electricity transmission project. The Eastern Green Link 2 (EGL2) Peterhead Local Fund is due to open on Tuesday 15th April, and will provide a total of £2,159,444 to communities in and around the Blue Toon over a five-year period, supporting projects and initiatives covering several priority areas that have been shaped by input from the local community. SSEN Transmission is currently recruiting for local people to join a panel that will oversee funding decisions, with the deadline for applications to the panel due to close on Friday 30th May. EGL2 is a 525kV, 2GW high voltage direct current (HVDC) subsea transmission cable from Peterhead to Drax in Yorkshire delivered as a joint venture by SSEN Transmission and National Grid Electricity Transmission (NGET). The launch of the fund marks the latest step in progress on the £4.3bn* project, which is due for completion in 2029.
-
Ground investigation work continues for SSEN Transmission’s ‘Pathway to 2030’ programme
Our Projects
SSEN Transmission is continuing to carry out permitted ground investigation activity along the proposed routes for its three proposed onshore overhead line projects, due to be delivered as part of its £20bn ‘Pathway to 2030’ programme.
-
Plans for new woodland as part of Harris-Stornoway overhead line project
-
Public invited to share views on plans for new clean power substation connection in Fasnakyle
-
Engagement events planned for the Beauly to Peterhead overhead line following project changes
-
Marine surveys continue for the UK’s biggest ever electricity transmission project
-
Major step forward for EGL2 as local firm completes civil engineering works ahead of schedule
Work to deliver the UK’s largest ever electricity transmission project has taken a major step forward with the completion of civil engineering works for a new High Voltage Direct Current (HVDC) converter station in Peterhead.
Page 26 of 161
