Search results
displaying 657 - 664 of 1285 results found for 'search for '
-
Recognising Earth Day 2021: Powering change by building back better
News & Views
A blog by Rob McDonald, Managing Director of SSEN Transmission
-
Turning sustainability ambitions into action
News & Views
Aileen McLeod, Head of Business Planning & Performance, explains more about our sustainability plan.
-
SSEN volunteers learn ‘green engineering’ to help save Pearls in Peril
News & Views
A team of volunteers from our Aberdeen office spent the day cutting lengths of willow to be transplanted far up the River Dee catchment...
-
Shin – Loch Buidhe 132kV Rebuild Pre-Application Consultation (PAC) Event
Projects
Events
We are holding a Pre-Application Consultation (PAC) Event for the new proposed Shin to Loch Buidhe replacement overhead line project. During this consultation, we are presenting our approach to developing the alignment selection. The consultation event will be taking place on: Thursday 29 January 2026, 4–7pm Bonar Bridge Community Hall, Lairg Road, Bonar Bridge IV24 3EA Our consultation includes information regarding our alignment process, the planning process, environmental and engineering considerations and maps which aim to give stakeholders and community members a better visual representation of the work on the project to date.
-
Clash Gour Wind Farm Connection Public Consultation
Projects
Events
We are hosting a public consultation event to gain views and feedback on our site selection options for our Clash Gour Wind Farm Connection project. Our face to face consultation event will give the local community and all interested parties an opportunity to view our proposals and speak with members of the project team.
-
The Western Isles HVDC Link - Underground Mainland Cable Connection Information Event - Contin Event
Projects
Events
We are holding initial information sessions for our proposed 83km High Voltage Direct Current (HVDC) link underground cable, that is planned to connect into our proposed new high voltage AC/DC converter station on the Isle of Lewis and the proposed Fanellan hub near Beauly.
-
Beauly - Peterhead 400kV Overhead Line - Coachford Proposed Alignment Design Changes: Cairnie Event
Projects
Events
We are pleased to be hosting public consultation events for the proposed Beauly – Peterhead 400kV Overhead Line Connection project. These events are to share the design changes to the proposed overhead line in the Keith area (Alignment sections 19 & 20) as a result of the removal of the proposed Coachford Substation as part of the project scope.
-
Fetteresso 132kV substation upgrade Pre-Application Consultation Feedback event
Projects
Events
We are pleased to be hosting a pre-application consultation feedback event for our proposed upgrade to the existing Fetteresso 132kV substation, located within Fetteresso Forest. During our drop-in event, you will be able to view further information about our proposed works, meet the team, ask questions and share feedback ahead of our planning application being submitted in 2026.
Page 83 of 161
