  • Pathway to 2030 Projects: Beauly Event

    Projects

    Events

    We are pleased to be hosting a public consultation feedback event for our proposed Spittal – Loch Buidhe – Beauly 400kV Overhead Line Connection and Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line Connection projects . We are hosting a series of face-to-face drop-in events across the project route and will be sharing our proposed alignment for the overhead line, presented through maps and visualisations.

  • Netherton Hub 400kV Overhead Line Connection to New Deer and Peterhead - Tie-in and Rebuild

    Projects

    Events

    We are holding the first of our consultation events to share potential alignments for the rebuild and tie-in projects. We invite all interested parties to attend our drop-in consultation event to discuss our plans with our project team, ask questions and share views. Copies of the consultation material will be available for download via the ‘Documents’ tab on the project webpage prior to the event.

  • Eastern Green Link 3 Land Cable Information Event: Longside Event

    Projects

    Events

    We're holding a community information event about the latest Eastern Green Link 3 underground cable alignment between Netherton Hub and Sandford Bay. The Netherton Hub is a strategic development proposed for a site near Longside to the west of Peterhead. Netherton Hub would be the site for the Eastern Green Link 3 converter station which the underground cable would connect with.

  • Muaitheabhal Wind Farm Connection Pre Application Consultation - Balallan Event

    Projects

    Events

    On 27 and 28 August 2025 we are holding the first of our statutory pre-application consultation (PAC) events for our proposed new Switching Station at Balallan. The pre-application process is a key first step in the Town and Country planning process for national planning applications

  • Willowdale / Clayhills GSP Information Event

    Projects

    Events

    On Tuesday 4 November we are holding an information event for our proposed Willowdale / Clayhills Grid Supply Point (GPS) Upgrade project. This event is designed to provide the public with more information on our plans for the upgrades to the existing Willowdale GSP and the decommissioning of the Clayhills GSP, ahead of submitting our planning application to Aberdeen City Council in early 2026.

  • Beinn Tharsuinn Wind Farm Connection

  • Glenmoriston GT Replacement

  • Chleansaid Wind Farm Connection