  • Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line: Inchberry Event

    Projects

    Events

    We are pleased to be hosting a public consultation feedback event for our proposed Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line Connection project. We are hosting a series of face-to-face drop-in events across the project route and will be sharing our proposed alignment for the overhead line, presented through maps and visualisations.

  • Netherton Hub 400kV Overhead Line Connection to New Deer and Peterhead Tie-In and Rebuild

    Projects

    Events

    We are holding the first of our consultation events to share potential alignments for the rebuild and tie-in projects. We invite all interested parties to attend our drop-in consultation event to discuss our plans with our project team, ask questions and share views. Copies of the consultation material will be available for download via the ‘Documents’ tab on the project webpage prior to the event.

  • Eastern Green Link 3 Land Cable Information Event: Boddam Event

    Projects

    Events

    We're holding a community information event about the latest Eastern Green Link 3 underground cable alignment between Netherton Hub and Sandford Bay. The Netherton Hub is a strategic development proposed for a site near Longside to the west of Peterhead. Netherton Hub would be the site for the Eastern Green Link 3 converter station which the underground cable would connect with.

  • Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line: New Deer Event

    Projects

    Events

    We are pleased to be hosting a drop-in session at New Deer for the Beauly-Blackhillock-New Deer-Peterhead 400kV Overhead Line project. This is an additional engagement event for those who were unable to attend the event in New Deer last week, Tuesday 04 March, due to the earlier timings.

  • New Strathy Switching Station Site Selection Public Consultation

    Projects

    Events

    We are holding a statutory pre-application consultation event for our proposed Strathy Switching Station project. The pre-application process is a key first step in the Town and Country planning process for this planning application. We are presenting our approach to developing the new 132kV Switching Station, required near Strathy in the Highlands of Scotland, to connect several consented and proposed wind farms to the transmission network.

  • Balallan 132kV Switching Station Project Pre-application consultation - Balallan event

    Projects

    Events

    On 27 & 28 August 2025 we are holding the first of our statutory pre-application consultation (PAC) events for our proposed new Switching Station at Balallan. The pre-application process is a key first step in the Town and Country planning process for national planning applications.

  • Muaitheabhal Wind Farm Connection Pre Application Consultation - Kershader event

    Projects

    Events

    On 27 and 28 August 2025 we are holding the first of our statutory pre-application consultation (PAC) events for our proposed new Switching Station at Balallan. The pre-application process is a key first step in the Town and Country planning process for national planning applications.

  • Eastern Green Link 5

    Consultation

    We are holding a consultation event for the marine element of our proposed Eastern Green Link 5 project. The project is in the early stages of development and the event is intended to provide a high-level overview of the project and specifically to present the broad area of interest for the subsea cable from the Aberdeenshire coast to the Scottish English maritime border