Search results
displaying 457 - 464 of 1284 results found for 'search for '
-
Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line: Keith Event
Projects
Events
We are pleased to be hosting a public consultation feedback event for our proposed Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line Connection project. We are hosting a series of face-to-face drop-in events across the project route and will be sharing our proposed alignment for the overhead line, presented through maps and visualisations.
-
Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line: Maud Event
Projects
Events
We are pleased to be hosting a public consultation feedback event for our proposed Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line Connection project. We are hosting a series of face-to-face drop-in events across the project route and will be sharing our proposed alignment for the overhead line, presented through maps and visualisations.
-
Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line: New Deer Event
Projects
Events
We are pleased to be hosting a public consultation feedback event for our proposed Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line Connection project. We are hosting a series of face-to-face drop-in events across the project route and will be sharing our proposed alignment for the overhead line, presented through maps and visualisations.
-
Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line: Inchberry Event
Projects
Events
We are pleased to be hosting a public consultation feedback event for our proposed Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line Connection project. We are hosting a series of face-to-face drop-in events across the project route and will be sharing our proposed alignment for the overhead line, presented through maps and visualisations.
-
Netherton Hub 400kV Overhead Line Connection to New Deer and Peterhead Tie-In and Rebuild
Projects
Events
We are holding the first of our consultation events to share potential alignments for the rebuild and tie-in projects. We invite all interested parties to attend our drop-in consultation event to discuss our plans with our project team, ask questions and share views. Copies of the consultation material will be available for download via the ‘Documents’ tab on the project webpage prior to the event.
-
Eastern Green Link 3 Land Cable Information Event: Boddam Event
Projects
Events
We're holding a community information event about the latest Eastern Green Link 3 underground cable alignment between Netherton Hub and Sandford Bay. The Netherton Hub is a strategic development proposed for a site near Longside to the west of Peterhead. Netherton Hub would be the site for the Eastern Green Link 3 converter station which the underground cable would connect with.
-
Beauly – Blackhillock – New Deer – Peterhead 400kV Overhead Line: New Deer Event
Projects
Events
We are pleased to be hosting a drop-in session at New Deer for the Beauly-Blackhillock-New Deer-Peterhead 400kV Overhead Line project. This is an additional engagement event for those who were unable to attend the event in New Deer last week, Tuesday 04 March, due to the earlier timings.
-
New Strathy Switching Station Site Selection Public Consultation
Projects
Events
We are holding a statutory pre-application consultation event for our proposed Strathy Switching Station project. The pre-application process is a key first step in the Town and Country planning process for this planning application. We are presenting our approach to developing the new 132kV Switching Station, required near Strathy in the Highlands of Scotland, to connect several consented and proposed wind farms to the transmission network.
Page 58 of 161
