Search results
displaying 481 - 488 of 1283 results found for 'search for '
-
Tomchrasky Wind Farm Connection: Alignment Options Public Consultation Event
Projects
Events
We are hosting public consultation events to gain views and feedback on our alignment options for the Tomchrasky wind farm connection. These follow our route consultation events held in October 2024.
-
Black Bridge Replacement Public Consultation Event
Projects
Events
We invite local residents and stakeholders to attend the first of two rounds of statutory pre-application (PAC) consultation events for our proposals to replace the Black Bridge near Kilmorack.
-
Access to Infrastructure (Telecoms)
The Communications (Access to Infrastructure) Regulations 2016 (the ATI Regulations) include provisions for the sharing of physical infrastructure across the country to deploy telecoms networks. This can include the sharing of ducts, cabinets, poles, towers and masts that deliver utility services across the country. If you would like to make an Access to Infrastructure request for SSEN Transmission to consider, please complete our short form.
-
Highland Council approves critical substation replacement projects and raises no objection to Melgarve cluster overhead line
SSEN Transmission has welcomed the decisions of Highland Council’s South Planning Committee this week to grant consent for three replacement substations at Deanie and Culligran in Glen Strathfarrar, and at Kilmorack.
-
Harris community shines brightly after SSEN Transmission team helps deliver Christmas tree
A Harris community is shining a little more brightly this week, after a team from SSEN Transmission answered a call for help to deliver and plant a Christmas tree in Tarbert. The team – from the Harris to Stornoway 132kV overhead line project – helped the North Harris Trust deliver and plant the tree in the village.
-
Engineering the future: SSEN Transmission wins big at Young Professional Green Energy Awards
-
Netherton Hub 400kV Overhead Line Connection to New Deer and Peterhead - Tie-in Connection
Projects
Events
We are holding our final consultation event for our proposed overhead line tie-in connection of the existing New Deer-Peterhead 400kV line into Netherton Hub. The tie-in project is required to connect the proposed 400kV AC substation within the Hub to the existing transmission network. This event concludes the pre-application process for the consent application for the tie-in that will be submitted under Section 37 of the Electricity Act 1989.
-
The backbone of a green economic recovery
News & Views
A blog by Roddy Wilson, Network Planning Manager for SSEN Transmission.
Page 61 of 161
