Stannergate 132kV Substation and Network Rail Feeder Station
Projects
Events
We are pleased to be hosting a second pre-application consultation event for our proposed Stannergate 132kV substation and Network Rail feeder station project, following our initial consultation in May 2024 and feedback period which closed on 27 June 2024.
-
Spittal to Peterhead High Voltage Direct Current (HVDC) Link: St Fergus Event
Projects
Events
We are pleased to be hosting a series of statutory pre-application consultation events for the marine elements of our proposed Spittal to Peterhead High Voltage Direct Current (HVDC) Link project.
-
SSEN Transmission helps Action Kintore reach fund raising target
News & Views
The Kintore substation team help out local project
-
Taking the first step on the road to TNUoS reform
News & Views
Andrew Urquhart, Head of Whole System at SSEN Transmission shares our support for Ofgem’s TNUoS...
-
SSEN Transmission donate £5000 to help secure future of vital community hub
-
The Western Isles HVDC Link - Underground Mainland Cable Connection Information Event - Dundonell Event
Projects
Events
We are holding initial information sessions for our proposed 83km High Voltage Direct Current (HVDC) link underground cable, that is planned to connect into our proposed new high voltage AC/DC converter station on the Isle of Lewis and the proposed Fanellan hub near Beauly.
-
Northern Substation Hub, Shetland 2 HVDC Link (incl. landfalls)
Conference
Brae Community Hall will host a consultation event presenting proposals for the Northern Substation Hub and the 2nd Shetland HVDC Link, including potential landfall sites. Come along to review the proposals, speak with the project team and provide your feedback
-
Lochluichart and Corriemoillie
As we continue the transition to net zero emissions, the continued connection of renewable generation is particularly important. This MSIP application presents the needs case, optioneering and costs for the connection of the Lochluichart Extension II Windfarm development to the greater transmission network. The connection of Lochluichart Extension II Windfarm will provide further renewable generation to the network. This is in line with the progress towards the UK and Scottish Government’s net zero targets by 2050 and 2045 respectively. By connecting this generator, we will contribute to meeting the demand for clean electricity to power homes in the north of Scotland.