Search results
displaying 745 - 752 of 1284 results found for 'search for '
-
Ofgem approves Orkney transmission link
-
Greener grid at Glen Kyllachy
News & Views
SSEN Transmission marked yet another significant milestone on the journey to net zero emission
-
SSEN Transmission receives international recognition at Green Apple Awards
News & Views
SSEN Transmission celebrate award wins for excellence in environmental best practice.
-
SSEN Transmission and Balfour Beatty advise on public access at Achnabreac
News & Views
Inveraray to Crossaig project team advise how to keep safe near works in Achnabreac
-
Kinardochy - Errochty UGC Pre-Application Consultation
Consultation
We are pleased to be holding a further public consultation feedback event to present our proposals for temporary and permanent access tracks, temporary bellmouth entrances and temporary compounds to facilitate a new underground cable between Kinardochy substation and Errochty substation, which forms part of the Beauly – Denny 400kV upgrade project.
-
Beauly - Peterhead 400kV Overhead Line - Coachford Proposed Alignment Design Changes: Keith Event
Projects
Events
We are pleased to be hosting public consultation events for the proposed Beauly – Peterhead 400kV Overhead Line Connection project. These events are to share the design changes to the proposed overhead line in the Keith area (Alignment sections 19 & 20) as a result of the removal of the proposed Coachford Substation as part of the project scope.
-
Shin to Loch Buidhe
Projects
Events
We are holding a consultation event for our proposed Shin to Loch Buidhe replacement overhead line project. We are presenting our approach to developing the new Shin to Loch Buidhe replacement overhead line, due to an increase in onshore wind generation around the existing Shin and Loch Buidhe substations.
-
Kergord to Northern Substation Routing Options Pre-Application Consultation (PAC) Event and Kergord 2 Substation Site Selection Consultation
Consultation
A pre-application consultation event is taking place at Voe Public Hall to present the proposed routing options for circuits between the existing Kergord Substation and the proposed Northern Substation Hub. Information will be available on route options, technology options and design considerations alongside the next steps in the planning process.
Page 94 of 161
