Overview
About the Project
We are currently developing proposals to reinforce the high voltage electricity network from Ardmore on the Isle of Skye to Fort Augustus. The existing 132kV overhead transmission line from Fort Augustus to Ardmore is the sole connection from the mainland electricity transmission system to Skye and the Western Isles, and is essential for maintaining security of supply in the area.
Recent studies into the condition of the existing infrastructure have indicated that the section of overhead line between Quoich substation and Ardmore substation requires to be rebuilt, and the existing line removed upon completion of the new line.
Furthermore, as a result of an increase in renewable energy projects requesting access to the electricity transmission network, there is a requirement to increase the capacity of the overhead line to allow renewable developments to connect.
Fort Augustus Substation to Broadford Substation
We are proposing to construct a new double circuit 132kV overhead line (OHL) comprising steel structures. The existing Fort Augustus to Skye Tee 132kV trident wood pole OHL and the existing 132kV steel lattice OHL between Skye Tee and Broadford would be dismantled and removed once the new OHL is operational.
Broadford Substation to Edinbane Substation
The existing single circuit wood pole trident 132kV OHL would be replaced with a new double circuit 132kV OHL comprising steel structures. The existing OHL would be dismantled and removed once the new OHL is operational.
Edinbane Substation to Ardmore Substation
The existing single circuit wood pole trident 132kV OHL would be replaced with a new higher capacity 132kV trident wood pole OHL. During construction, the existing OHL and its replacement would run in tandem but on energisation of the new OHL, the existing OHL would be dismantled and removed.
Why is the Project Required?
Securing Supply
The current overhead line was constructed between 1956 and 1989, and after a long service is now reaching the end of its operational capabilities. The replacement is essential to maintain security of supply to homes and businesses along its route, as well as to the Western Isles which is supplied by two subsea cables from the north of Skye.
Connecting Renewables
There is demand to connect new renewable electricity generation on Skye, which requires an increase in capacity of the overhead line.
Network for Net Zero
We intend to ‘future proof’ the replacement line to allow the connection of additional renewables to help meet government Net Zero climate change targets, supporting the transition to Net Zero emissions.
Film: Over the Hills to Skye 1978
The film, produced by the North of Scotland Hydro Electric Board (now Scottish and Southern Electricity Networks) and Balfour Beatty, illustrates the trials associated with the construction of the original line which connected the Isle of Skye to the mainland of Scotland in the 1970s.
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project Updates
Featured updates
Featured updates for this project
Works Update for week commencing 20 May 2024
Project updates
Project Documents
Project Documentation
-
KLH 1 PDF.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 270.1 KB
-
KLH 2 PDF.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 273.9 KB
-
LT000091_ENV_029_Section1_Aerial_20240509 1.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 8.2 MB
-
LT000091_ENV_029_Section1_Aerial_20240509 4.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.8 MB
-
LT000091_ENV_029_Section1_Aerial_20240509 5.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.5 MB
-
LT000091_ENV_029_Section1_Aerial_20240509 6.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 8.4 MB
-
LT000091_ENV_029_Section3_Aerial_20240509 1.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 10.1 MB
-
LT000091_ENV_029_Section3_Aerial_20240509 2.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.9 MB
-
LT000091_ENV_029_Section4_Aerial_20240509 1.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 10 MB
-
LT000091_ENV_029_Section4_Aerial_20240509 2.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.9 MB
-
LT000091_ENV_029_Section4_Aerial_20240509 4.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.8 MB
-
LT000091_ENV_029_Section4_Aerial_20240509 5.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 8 MB
-
LT000091_ENV_029_Section5_Aerial_20240509 1.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.3 MB
-
LT000091_ENV_029_Section5_Aerial_20240509 3.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 10.8 MB
-
LT000091_ENV_029_Section5_Aerial_20240509 4.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.9 MB
-
LT000091_ENV_029_Section5_Aerial_20240509 5.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 9.3 MB
-
LT000091_ENV_029_Section5_Aerial_20240509 6.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 10.3 MB
-
LT000091_ENV_029_Section5_Aerial_20240509 7.pdf
- Type:
- Date:
- 17 May 2024
- Size:
- 11.4 MB
-
Kylerhea Community Meeting - Aug 22.pdf
- Type:
- Date:
- 22 August 2023
- Size:
- 2.4 MB
-
Skye LOTI Final Needs Case 2023
- Type:
- Date:
- 16 May 2023
- Size:
- 1.8 MB
-
Broadford and Edinbane Substations Consultations - A4 Poster - Sept 2022.pdf
- Type:
- Date:
- 12 October 2022
- Size:
- 152.7 KB
-
Skye Consultation Booklet - Edinbane and Broadford Substations Sept 2022.pdf
- Type:
- Date:
- 12 October 2022
- Size:
- 5.4 MB
-
figure-241a-to-243c-section-4-baseline-alignment-variants-designations-and-constraints.pdf
- Type:
- Date:
- 11 October 2022
- Size:
- 41 MB
-
119026-d-roc10-16-010-preferred-route_rfs.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 6.4 MB
-
appendix-1-approach-to-route-and-alignment-selection.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 116.1 KB
-
appendix-1-ecu-stakeholder-letter-8-oct-2020.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 287.6 KB
-
appendix-2-summary-of-route-options-stage.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 1.8 MB
-
appendix-3-comparative-alignment-tables.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 569.9 KB
-
appendix-4-preliminary-statutory-consultation-responses.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 216.1 KB
-
appendix-5-landscape-and-visual-appraisal-of-baseline-ohl-alignment-in-section-2.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 3.5 MB
-
figure-1-proposed-preferred-route.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 8.3 MB
-
figure-201a-to-203c-section-0-baseline-alignment-variants-designations-and-constraints.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 23.4 MB
-
figure-211a-to-213c-section-1-baseline-alignment-variants-designations-and-constraints.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 19.6 MB
-
figure-221a-to-223c-section-2-baseline-alignment-variants-designations-and-constraints.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 23.1 MB
-
figure-231a-to-233c-section-3-baseline-alignment-variants-designations-and-constraints.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 16.8 MB
-
figure-251a-to-253c-section-5-baseline-alignment-variants-designations-and-constraints.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 30.5 MB
-
figure-261-to-263-section-6-baseline-alignment-variants-designations-and-constraints.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 10.6 MB
-
figure-30a-c-preferred-alignment-and-design-solution-section-0.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 7 MB
-
figure-31a-b-preferred-alignment-and-design-solution-section-1.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 5.5 MB
-
figure-32a-b-preferred-alignment-and-design-solution-section-2.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 6.1 MB
-
figure-33a-b-preferred-alignment-and-design-solution-section-3.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 4.2 MB
-
figure-34a-c-preferred-alignment-and-design-solution-section-4.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 12.7 MB
-
figure-35a-c-preferred-alignment-and-design-solution-section-5.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 7.4 MB
-
figure-36-preferred-alignment-and-design-solution-section-6-1.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 3.2 MB
-
figure-37a-g-viewpoint-location-plans.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 36.2 MB
-
figure-401a-c-vp1-trumpan-church-and-burial-ground.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 4.9 MB
-
figure-402a-c-vp2-trumpan.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 3.3 MB
-
figure-403a-c-vp3-dun-hallin-broch-from-knockbreck-school.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 5.6 MB
-
figure-411a-c-vp5-glen-vic-askill-from-dun-arkaig-broch.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 4.5 MB
-
figure-412a-c-vp6-mugeary.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 3.5 MB
-
figure-421a-d-vp7-a87-at-sligachan-camp-site.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 5.7 MB
-
figure-422a-d-vp8-a87-in-gleann-torra-mhichaig.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 7.1 MB
-
figure-423a-d-vp9-moll-minor-road-near-kinloch-ainort.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 10 MB
-
figure-424a-d-vp10-a87-overlooking-loch-ainort.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 5.8 MB
-
figure-431a-c-vp11-view-from-near-a851-looking-west.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 5.2 MB
-
figure-432a-c-vp12-donald-murchison-s-monument.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 4.6 MB
-
figure-441a-c-vp13-glen-more.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 5.4 MB
-
figure-442a-c-vp14-gleandubhlochain-looking-nw.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 6.2 MB
-
figure-443a-c-vp15-road-above-kinloch-hourn.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 5.6 MB
-
figure-444a-c-vp16-loch-coire-shubh.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 4.2 MB
-
figure-451a-c-vp17-loch-quoich-dam.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 4.3 MB
-
overview-map-lm.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 31.5 MB
-
section-0-lm.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 30.8 MB
-
section1-lm.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 31.5 MB
-
section-2-lm.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 34.9 MB
-
section-3-lm.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 35.3 MB
-
section-4-lm.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 31.7 MB
-
section-5-and-6-lm.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 29.1 MB
-
skye-loti-initial-needs-case-30-jul-2021_redacted-final-31-aug-version.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 9.1 MB
-
skye-reinforcement-project-alignment-consultation-document-september-2021.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 2.6 MB
-
skye-reinforcement-project-report-on-consultation-alignment-selection-march-2022.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 11.8 MB
-
skye-reinforcement-project-roc-routeing-nov-2020-updated.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 1.2 MB
-
ssen-skye-consultation-banners-25344-artwork-digi.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 8.6 MB
-
ssen-skye-consultation-event-booklet-25283-artwork-digi-single-pages.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 16.7 MB
-
understanding-skyes-future-energy-ambitions-seminar-slides.pdf
- Type:
- Date:
- 18 September 2022
- Size:
- 2.2 MB
Additional Information - Section 37 - August 2023
Additional Information - Section 37 - February 2023
Section 37 Application - Planning Statement, Cover Letter and Advert
Section 37 Application - Non Technical Summary
-
Non-Technical Summary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.6 MB
Section 37 Application - Volume 1
Section 37 Application - Volume 2
Section 37 Application - Volume 3 - Figure 01. The Proposed Development
-
Volume 3 - Figure V1-1.1 - Overview of Proposed Development.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 8.1 MB
-
Volume 3 - Figure V1-3.1 - The Proposed Development - 1 of 3.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.4 MB
-
Volume 3 - Figure V1-3.1 - The Proposed Development - 2 of 3.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.9 MB
-
Volume 3 - Figure V1-3.1 - The Proposed Development - 3 of 3.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.3 MB
-
Volume 3 - Figure V1-4.1 - Route Options.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.7 MB
-
Volume 3 - Figure V1-4.2 - Baseline Alignment and Variants.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.3 MB
-
Volume 3 - Figure V1-5.1 - Cumulative Developments.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.3 MB
Section 37 Application - Volume 3 - Figure 02. Zone of Theoretical Visibility
-
Volume 3 - Figure V2-3.1-S0 - Section 0 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.9 MB
-
Volume 3 - Figure V2-3.1-S1 - Section 1 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-3.1-S2 - Section 2 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.8 MB
-
Volume 3 - Figure V2-3.1-S3a - Section 3 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-3.1-S3b - Section 3 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.8 MB
-
Volume 3 - Figure V2-3.1-S4 - Section 4 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5 MB
-
Volume 3 - Figure V2-3.1-S5 - Section 5 Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.1 MB
Section 37 Application - Volume 3 - Figure 03. Designated and Protected Landscapes
-
Volume 3 - Figure V2-3.2-S0 - Section 0 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 1.7 MB
-
Volume 3 - Figure V2-3.2-S1 - Section 1 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V2-3.2-S2 - Section 2 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7 MB
-
Volume 3 - Figure V2-3.2-S3 - Section 3 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.7 MB
-
Volume 3 - Figure V2-3.2-S4 - Section 4 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 3.1 MB
-
Volume 3 - Figure V2-3.2-S5 - Section 5 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.7 MB
-
Volume 3 - Figure V2-3.2-S6 - Section 6 Designated and Protected Landscapes.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.2 MB
Section 37 Application - Volume 3 - Figure 04. Landscape Character
-
Volume 3 - Figure V2-3.3-S0 - Section 0 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.7 MB
-
Volume 3 - Figure V2-3.3-S1 - Section 1 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-3.3-S2 - Section 2 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V2-3.3-S3 - Section 3 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.7 MB
-
Volume 3 - Figure V2-3.3-S4 - Section 4 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.2 MB
-
Volume 3 - Figure V2-3.3-S5 - Section 5 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-3.3-S6 - Section 6 Landscape Character.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4 MB
Section 37 Application - Volume 3 - Figure 05. Visual Receptors
-
Volume 3 - Figure V2-3.4-S0 - Section 0 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7 MB
-
Volume 3 - Figure V2-3.4-S1 - Section 1 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.4-S2 - Section 2 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.4-S3 - Section 3 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.3 MB
-
Volume 3 - Figure V2-3.4-S4 - Section 4 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.8 MB
-
Volume 3 - Figure V2-3.4-S5 - Section 5 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.4-S6 - Section 6 Visual Receptors.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
Section 37 Application - Volume 3 - Figure 06. Developments Included in the Cumulative Assessment
-
Volume 3 - Figure V2-3.5-S0 - Section 0 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 3.1 MB
-
Volume 3 - Figure V2-3.5-S1 - Section 1 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-3.5-S2 - Section 2 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-3.5-S3 - Section 3 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.1 MB
-
Volume 3 - Figure V2-3.5-S4 - Section 4 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-3.5-S5 - Section 5 - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 9.6 MB
Section 37 Application - Volume 3 - Figure 07. Ecological Designated Sites and Ancient Woodland within 5km
-
Volume 3 - Figure V2-4.1 - Ecological Designated Sites and Ancient Woodland within 5 km.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 3.1 MB
Section 37 Application - Volume 3 - Figure 08. Carbon and Peatland Map 2016
-
Volume 3 - Figure V2-4.2 - Carbon and Peatland Map 2016.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 2.3 MB
Section 37 Application - Volume 3 - Figure 09. NVC Survey
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 0 - 0.01-0.11.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 7.2 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 0 - 0.11-0.19.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.3 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 1 - 1.01-1.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 1 - 1.09-1.16.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 2 - 2.01-2.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 2 - 2.09-2.16.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 3 - 3.01-3.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.4 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 3 - 3.09-3.15.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 4 - 4.01-4.14.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 8.6 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 4 - 4.15-4.29.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 8.8 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 5 - 5.01-5.08.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 5 - 5.09-5.17.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 6.6 MB
-
Volume 3 - Figure V2-4.3 - NVC Survey - Section 6.pdf
- Type:
- Date:
- 06 October 2022
- Size:
- 4.4 MB
Section 37 Application - Volume 3 - Figures 10. Protected Species
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.6 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.4 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.8 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V2-4.4 - Protected Species - Section 6.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.3 MB
Section 37 Application - Volume 3 - Figures 11. Bryophytes and Lichens
-
Volume 3 - Figure V2-4.5 - Bryophytes and Lichens.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.3 MB
-
Volume 3 - Figure V2-4.5 - Kinloch and Kyleakin Hills SAC-SSSI Bryophytes and Lichens.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.1 MB
Section 37 Application - Volume 3 - Figures 12. Hydrology
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.6 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.1 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
Section 37 Application - Volume 3 - Figures 13. Geology and Peat
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.1 - Superficial Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.6 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.1 MB
-
Volume 3 - Figure V2-7.2 - Bedrock Geology - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.5 MB
-
Volume 3 - Figure V2-7.3 - Peatland Classification - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 3 - Figure V2-7.4 - Peat Depth - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
Section 37 Application - Volume 3 - Figures 14. Cultural Heritage Assets
-
Volume 3 - Figure V2-8.1-S0 - Cultural Heritage Assets in the Inner Study Area - Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5 MB
-
Volume 3 - Figure V2-8.1-S1 - Cultural Heritage Assets in the Inner Study Area - Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V2-8.1-S2 - Cultural Heritage Assets in the Inner Study Area - Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.2 MB
-
Volume 3 - Figure V2-8.1-S3 - Cultural Heritage Assets in the Inner Study Area - Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.1 MB
-
Volume 3 - Figure V2-8.1-S4 - Cultural Heritage Assets in the Inner Study Area - Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8 MB
-
Volume 3 - Figure V2-8.1-S5 - Cultural Heritage Assets in the Inner Study Area - Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.5 MB
-
Volume 3 - Figure V2-8.1-S6 - Cultural Heritage Assets in the Inner Study Area - Section 6.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 3 - Figure V2-8.2-S0 - Cultural Heritage Assets in the Outer Study Area - Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.6 MB
-
Volume 3 - Figure V2-8.2-S1 - Cultural Heritage Assets in the Outer Study Area - Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.2 MB
-
Volume 3 - Figure V2-8.2-S2 - Cultural Heritage Assets in the Outer Study Area - Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.3 MB
-
Volume 3 - Figure V2-8.2-S3 - Cultural Heritage Assets in the Outer Study Area - Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 3 - Figure V2-8.2-S4 - Cultural Heritage Assets in the Outer Study Area - Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.9 MB
-
Volume 3 - Figure V2-8.2-S5 - Cultural Heritage Assets in the Outer Study Area - Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.1 MB
Section 37 Application - Volume 3 - Figures 15. Visualisations
-
Volume 3 - Figure V2-8.3-S0a-d - Visualisation from Trumpan Church and Burial Ground.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.2 MB
-
Volume 3 - Figure V2-8.3-S1a-d - Visualisation from Dun Arkaig Broch.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.1 MB
-
Volume 3 - Figure V2-8.3-S3a-b - Wireline from Old Corry Cairns.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.3 MB
-
Volume 3 - Figure V2-8.4-S0a-d - Visualisation toward Dun Hallin Broch from Knockbreck School.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.1 MB
Section 37 Application - Volume 3 - Figures 16. Study Area
-
Volume 3 - Figure V2-10.1 - Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.9 MB
Section 37 Application - Volume 3 - Figures 17. Civils
-
Volume 3 - Figure V2-10.2 - Traffic Count Location Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.7 MB
-
Volume 3 - Figure V2-10.3 - Accident Location Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.7 MB
-
Volume 3 - Figure V2-10.4 - Construction Vehicle Delivery Routes.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.8 MB
Section 37 Application - Volume 3 - Figures 18. The Alternative Alignment
-
Volume 3 - Figure V6-2.1 - The Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.5 MB
-
Volume 3 - Figure V6-3.1a - Alternative Alignment Zone of Theoretical Visibility.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7 MB
-
Volume 3 - Figure V6-3.2a - Alternative Alignment Designated and Protected Landscapes.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V6-3.3a - Alternative Alignment Landscape Character.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 3 - Figure V6-3.4a - Alternative Alignment Visual Receptors.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.6 MB
-
Volume 3 - Figure V6-3.5 - Alternative Alignment - Developments Included in the Cumulative Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.1 MB
-
Volume 3 - Figure V6-4.1 - Ecological Designated Sites and AW - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 781.8 KB
-
Volume 3 - Figure V6-4.2 - Carbon and Peatland Map 2016 - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 435.8 KB
-
Volume 3 - Figure V6-4.3 - NVC Survey - Alternative Alignment - 3.01-3.15.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.7 MB
-
Volume 3 - Figure V6-4.3 - NVC Survey - Alternative Alignment - 3.16-3.19.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.3 MB
-
Volume 3 - Figure V6-4.4 - Protected Species - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.9 MB
-
Volume 3 - Figure V6-6.1 - Local Hydrology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.9 MB
-
Volume 3 - Figure V6-6.2 - Regional Hydrogeology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 3 - Figure V6-6.3 - Groundwater Vulnerability.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.4 MB
-
Volume 3 - Figure V6-6.4 - GWDTE.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4 MB
-
Volume 3 - Figure V6-7.1 - Superficial Geology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V6-7.2 - Bedrock Geology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.4 MB
-
Volume 3 - Figure V6-7.3 - Peatland Classification.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.7 MB
-
Volume 3 - Figure V6-7.4 - Peat Depth.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.2 MB
-
Volume 3 - Figure V6-8.1 - Cultural Heritage Assets in the Inner Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
-
Volume 3 - Figure V6-8.2 - Cultural Heritage Assets in the Outer Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
Section 37 Application - Volume 4A - Visualisations to NatureScot Guidelines
-
Volume 4A - Figure V4A-0.1a-d - VL0-1 Trumpan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.2 MB
-
Volume 4A - Figure V4A-0.2a-d - VL0-2 Upper Feorlig.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.7 MB
-
Volume 4A - Figure V4A-1.1a-d - VL1-1 B885 at Leacan Nighean an t-Siosalaich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 4A - Figure V4A-1.2a-d - VL1-2 Mugeary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.5 MB
-
Volume 4A - Figure V4A-1.3a-d - VL1-3 Allt Dubh Viewpoint, north of Sligachan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
-
Volume 4A - Figure V4A-2.1a-d - VL2-1 Luib.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 4A - Figure V4A-2.2a-d - VL2-2 Strollamus.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.2 MB
-
Volume 4A - Figure V4A-2.3a-d - VL2-3 Srath Mor.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.9 MB
-
Volume 4A - Figure V4A-2.4a-d - VL2-4 Beinn na Caillich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 4A - Figure V4A-3.1a-d - VL3-1 A851 near Market Stance.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 4A - Figure V4A-3.2a-d - VL3-2 Cnoc a' Mhadaidh Ruaidh Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.1 MB
-
Volume 4A - Figure V4A-3.3a-d - VL3-3 Donald Murchison's Monument.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.4 MB
-
Volume 4A - Figure V4A-3.4a-d - VL3-4 Bealach Udal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.4 MB
-
Volume 4A - Figure V4A-3.5a-d - VL3-5 RSPB Otter Haven Car Park.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.4 MB
-
Volume 4A - Figure V4A-3.6a-d - VL3-6 Kylerhea Village.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 4A - Figure V4A-3.7a-d - VL3-7 Glenelg Ferry Crossing.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.3 MB
-
Volume 4A - Figure V4A-4.1a-d - VL4-1 Glen More.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9 MB
-
Volume 4A - Figure V4A-4.2a-d - VL 4-2 Bealach Aoidhdailean.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.6 MB
-
Volume 4A - Figure V4A-4.3a-d - VL 4-3 Gleandubhlochain.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.4 MB
-
Volume 4A - Figure V4A-4.4a-d - VL 4-4 Road above Kinloch Hourn.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.8 MB
-
Volume 4A - Figure V4A-4.5a-d - VL 4-5 Loch Coire Shubh.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.5 MB
-
Volume 4A - Figure V4A-5.1a-d - VL5-1 Loch Quoich Dam.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8 MB
-
Volume 4A - Figure V4A-5.2a-d - VL5-2 Loch Lundie Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 4A - Visualisations (NatureScot) Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
Section 37 Application - Volume 4B - Visualisations to The Highland Council Guidelines
-
Volume 4B - Figure V4B-0.1a-e - VL0-1 Trumpan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.4 MB
-
Volume 4B - Figure V4B-0.2a-e - VL0-2 Upper Feorlig.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 4B - Figure V4B-1.1a-e - VL1-1 B885 at Leacan Nighean an t-Siosalaich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Figure V4B-1.2a-e - VL1-2 Mugeary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.5 MB
-
Volume 4B - Figure V4B-1.3a-e - VL1-3 Allt Dubh Viewpoint, north of Sligachan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.5 MB
-
Volume 4B - Figure V4B-2.1a-e - VL2-1 Luib.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.9 MB
-
Volume 4B - Figure V4B-2.2a-e - VL2-2 Strollamus.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.5 MB
-
Volume 4B - Figure V4B-2.3a-e - VL2-3 Srath Mor.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.6 MB
-
Volume 4B - Figure V4B-2.4a-e - VL2-4 Beinn na Caillich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.6 MB
-
Volume 4B - Figure V4B-3.1a-e - VL3-1 A851 near Market Stance.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7 MB
-
Volume 4B - Figure V4B-3.2a-e - VL3-2 Cnoc a' Mhadaidh Ruaidh Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.4 MB
-
Volume 4B - Figure V4B-3.3a-e - VL3-3 Donald Murchisons Monument.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Figure V4B-3.4a-e - VL3-4 Bealach Udal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Figure V4B-3.5a-e - VL3-5 RSPB Otter Haven Car Park.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.5 MB
-
Volume 4B - Figure V4B-3.6a-e - VL3-6 Kylerhea Village.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.6 MB
-
Volume 4B - Figure V4B-3.7a-e - VL3-7 Glenelg Ferry Crossing.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.6 MB
-
Volume 4B - Figure V4B-4.1a-e - VL4-1 Glen More.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.4 MB
-
Volume 4B - Figure V4B-4.2a-e - VL4-2 Bealach Aoidhdailean.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.9 MB
-
Volume 4B - Figure V4B-4.3a-e - VL4-3 Gleandubhlochain.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.3 MB
-
Volume 4B - Figure V4B-4.4a-e - VL4-4 Road above Kinloch Hourn.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.6 MB
-
Volume 4B - Figure V4B-4.5a-e - VL4-5 Loch Coire Shubh.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8 MB
-
Volume 4B - Figure V4B-5.1a-e - VL5-1 Loch Quoich Dam.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.7 MB
-
Volume 4B - Figure V4B-5.2a-e - VL5-2 Loch Lundie Core Path.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 4B - Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5 MB
Section 37 Application - Volume 5 - Appendices
-
Volume 5 - Appendix V2-10.1 - Transport Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.3 MB
-
Volume 5 - Appendix V2-11.1 - Outdoor Access Management Plan - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.1 MB
-
Volume 5 - Appendix V2-11.1 - Outdoor Access Management Plan - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.6 MB
-
Volume 5 - Appendix V2-11.2 - Socio-Economic Baseline.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 249.7 KB
-
Volume 5 - Appendix V2-11.3 - Recreation and Tourism Baseline.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Reports.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 167.7 KB
-
Volume 5 - Appendix V6-2.1 - Indicative Tower Schedule (Alternative Alignment).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 189.5 KB
-
Volume 5 - Appendix V6-3.1 Landscape Character Assessment (Alternative Alignment).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 242.7 KB
-
Volume 5 - Appendix V6-3.2 Visual Receptor Assessment (Alternative Alignment).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 346.2 KB
-
Volume 5 - Appendix V6-6.2 - Alternative Alignment Schedule of Permanent Watercourse Crossings.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.6 MB
-
Volume 5 - Appendix V6-6.4 - Alternative Alignment GWDTE Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 472.8 KB
-
Volume 5 - Appendix V6-8.1 - Scope and Methodology of Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 214.3 KB
-
Volume 5 - Appendix V6-8.2 - Cultural Heritage Assets in the Inner Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 253 KB
-
Volume 5 - Appendix V6-8.3 - Designated Cultural Heritage Assets in the Outer Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 127.2 KB
-
Volume 5 - Appendix V6-8.4 - Cultural Heritage References.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 55.8 KB
-
Volume 5 - Appendix V6-9.1 - Kyle Farm and Mudalach Woodland Report - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.6 MB
-
Volume 5 - Technical Appendices - Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 952.2 KB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1A Balmeanach.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.8 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1B Glenvicaskill.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1C Mugeary.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1D Glenvarragill.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1E Broadford West.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 931 KB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1F Riverside and Old Corry.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1H Bernera Farm.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.8 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1I Towers BF95-BF96.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.5 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1J Scallasaig.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.8 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1K Eileanreach.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex 1L Arnisdale.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex G Kyle Farm & Mudalach.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.7 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1M Kinlochourn.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.1 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1N Glenquoich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 4.2 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1O Tomdoun & East Glenquoich.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.2 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1P Lochan Torr.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1Q Ardochy.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.6 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1R Druim Buidhe.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1S Leacan Dubha.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report - Annex1T Kilfinnan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.5 MB
-
Volume 5 - Appendix V2-9.1 - Woodland Report Annex 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 115.7 KB
-
Volume 5 - Appendix V2-5.1 - Ornithology Technical Report Apr-16 to Mar-19 - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6 MB
-
Volume 5 - Appendix V2-5.1 - Ornithology Technical Report Apr-16 to Mar-19 - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 6.5 MB
-
Volume 5 - Appendix V2-5.2 - Ornithology Technical Report Apr-16 to Dec-18.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5 MB
-
Volume 5 - Appendix V2-5.3 - Ornithology Technical Report Jan to Aug 2021.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.1 MB
-
Volume 5 - Appendix V2-5.4 - Shadow Habitats Regulations Appraisal for the Cuillins SPA.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.3 MB
-
Volume 5 - Appendix V2-5.5 - Shadow Habitats Regulations Appraisal for the West Inverness-shire Lochs SPA.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.1 MB
-
Volume 5 - Appendix V2-6.1 - Methodology for Assessing Significance of Effect.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 453.4 KB
-
Volume 5 - Appendix V2-6.2 - Schedule of Permanent Water Crossings.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V2-6.4 - GWTDE Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 463.9 KB
-
Volume 5 - Appendix V2-7.1 - Significance Criteria.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 445.4 KB
-
Volume 5 - Appendix V2-7.2 - Peat Landslide Hazard and Risk Assessment - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.7 MB
-
Volume 5 - Appendix V2-7.2 - Peat Landslide Hazard and Risk Assessment - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7.2 MB
-
Volume 5 - Appendix V2-7.3 - Peat and Carbon Management Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.5 MB
-
Volume 5 - Appendix V2-8-1 - Scope and Methodology of Assessment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 283.7 KB
-
Volume 5 - Appendix V2-8-2 - Cultural Heritage Assets in the Inner Study Area .pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.4 MB
-
Volume 5 - Appendix V2-8-3 - Designated Cultural Heritage Assets in the Outer Study Area.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 339.8 KB
-
Volume 5 - Appendix V2-8-4 - Cultural Heritage References .pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 111.8 KB
-
Volume 5 - Appendix V2-3.10 - LVIA of Section 4.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 953.5 KB
-
Volume 5 - Appendix V2-3.11 - LVIA of Section 5.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 865.5 KB
-
Volume 5 - Appendix V2-3.12 - LVIA of Section 6.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 290.1 KB
-
Volume 5 - Appendix V2-3.13 - Landscape and Visual Mitigation Measures.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 162.4 KB
-
Volume 5 - Appendix V2-3.14 - Landscape and Visual Reference List.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 112.8 KB
-
Volume 5 - Appendix V2-3.6 - LVIA of Section 0.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 817.5 KB
-
Volume 5 - Appendix V2-3.7 - LVIA of Section 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 733.1 KB
-
Volume 5 - Appendix V2-3.8 - LVIA of Section 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1 MB
-
Volume 5 - Appendix V2-3.9 - LVIA of Section 3.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 881.4 KB
-
Volume 5 - Appendix V2-4.1 - Legislation Policy + Guidance.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 129.2 KB
-
Volume 5 - Appendix V2-4.2 - Assessment Methodology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 190.4 KB
-
Volume 5 - Appendix V2-4.3 - NVC and Habitats Survey Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 964.5 KB
-
Volume 5 - Appendix V2-4.4 - Protected Species Survey Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 874.5 KB
-
Volume 5 - Appendix V2-4.5 - Watercourse Crossing Fish Habitat Survey.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.7 MB
-
Volume 5 - Appendix V2-4.6 - Kinloch and Kyleakin Hills SAC Bryophyte & Lichen Survey Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 2.5 MB
-
Volume 5 - Appendix V2-4.7 - Kinloch and Kyleakin Hills SAC Shadow HRA Figures - 1 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V2-4.7 - Kinloch and Kyleakin Hills SAC Shadow HRA Figures - 2 of 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 5 - Appendix V2-4.7 - Kinloch and Kyleakin Hills SAC Shadow HRA.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.3 MB
-
Volume 5 - Appendix V1-3.1 - Indicative Pole and Tower Schedule.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 755.4 KB
-
Volume 5 - Appendix V1-3.2 - Further Engineering Design Information.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.1 MB
-
Volume 5 - Appendix V1-3.3 - Preliminary Appraisal of Borrow Pits Quarry and Site Compounds.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V1-3.4 - Preliminary Appraisal of Public Road Improvement Works.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 5.3 MB
-
Volume 5 - Appendix V1-3.5 - General Environmental Management Plans (GEMPs) and Species Protection Plans (SPPs).pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 7 MB
-
Volume 5 - Appendix V1-3.6 - Schedule of Mitigation Measures.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 475.2 KB
-
Volume 5 - Appendix V1-3.7 - Outline Site Restoration Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 996.1 KB
-
Volume 5 - Appendix V1-3.8 - Dismantling Plan.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 1.2 MB
-
Volume 5 - Appendix V1-3.9 - Outline CEMP.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 122.4 KB
-
Volume 5 - Appendix V1-4.1 - Alternative Technology Options and Design Solutions.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 697.2 KB
-
Volume 5 - Appendix V1-5.1 - EIA Team.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 138.2 KB
-
Volume 5 - Appendix V1-6.1 - Public Consultation Report.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 5 - Appendix V1-6.2 - Scoping Report Part 1.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9.3 MB
-
Volume 5 - Appendix V1-6.2 - Scoping Report Part 2.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 9 MB
-
Volume 5 - Appendix V1-6.3 - Scoping Opinion.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 3.4 MB
-
Volume 5 - Appendix V1-6.4 - Scoping Matrix.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 596.2 KB
-
Volume 5 - Appendix V1-6.5 - Gate Check Report - May 2022.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 8.7 MB
-
Volume 5 - Appendix V2-3.1 - Landscape and Visual Scoping Appraisal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 411.7 KB
-
Volume 5 - Appendix V2-3.2 - LVIA Methodology.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 269.9 KB
-
Volume 5 - Appendix V2-3.3 - Technical Methodologies for Visual Representation.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 272.6 KB
-
Volume 5 - Appendix V2-3.4 - Landscape Character Types Sensitivity Appraisal.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 320.8 KB
-
Volume 5 - Appendix V2-3.5 - Assessment of Designated and Protected Landscapes.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 553.5 KB
Section 37 Application - Volume 6 - EIA of Alternative Alignment
-
Volume 6 - Chapter 1 - Introduction - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 123.1 KB
-
Volume 6 - Chapter 10 - Transport - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 123.9 KB
-
Volume 6 - Chapter 11 - Socio-Economic Recreation and Tourism - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 280.2 KB
-
Volume 6 - Chapter 2 - Project Description - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 473.3 KB
-
Volume 6 - Chapter 3 - Landscape and Visual - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 434.5 KB
-
Volume 6 - Chapter 4 - Ecology - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 934 KB
-
Volume 6 - Chapter 5 - Ornithology - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 241.9 KB
-
Volume 6 - Chapter 6 - Water Environment - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 342.6 KB
-
Volume 6 - Chapter 7 - Geology and Soils Environment - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 349.3 KB
-
Volume 6 - Chapter 8 - Cultural Heritage - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 196.3 KB
-
Volume 6 - Chapter 9 - Forestry - Alternative Alignment.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 151.9 KB
-
Volume 6 - Front Cover and Contents.pdf
- Type:
- Date:
- 07 October 2022
- Size:
- 940.9 KB
Works
Planning stage and maintenance works (General Information)
The proposed Skye Reinforcement Project will be a major civil engineering project. Whilst the Scottish Government’s Energy Consent Unit’s determination of the Section 37 Application for the Skye Reinforcement Project is outstanding, SSEN Transmission is going to undertake works in the planning stage of significant engineering projects.
Regardless of the decision on the Section 37 application, access to the existing Skye overhead line will be required in order to undertake more frequent detailed inspections of the ageing and failing asset.
Works will include:
- Public Road Improvements works,
- maintenance of access tracks (maps are available in Project Documents) and
- ground investigation works (both intrusive and unintrusive).
All works are undertaken under Permitted Development Rights and we will be working closely with local communities, relevant departments in The Highland Council (e.g. Road, Planning, Access), Statutory Partners and Land Owners. All works are subject to pre-commencement environmental surveys, and suitable mitigations will be implemented where necessary.
We will communicate all works through the ‘Project updates’ section of this webpage (see ‘Project Update’ tab above) where the works details will be available.
Access Track Works
The existing Skye Overhead Line is serviced by many existing access tracks. These tracks, over the years, have become overgrown and are in many locations no longer suitable for vehicular traffic.
The scope of maintenance may include trimming trees/felling where trees pose a risk to the access track, removal of overgrown vegetation and scraping back to original hard core, clearing out and re-establishing drainage ditches, ripping and compacting existing track surfaces where possible and capping existing tracks with a fresh layer stone to smooth out any dips in the existing track layout and provide a fresh running surface for safe access.
Silt mitigation measures may also be introduced to ensure compliance with SEPA Controlled Activity Regulations.
Please note that due to overgrowth, current tracks might appear narrower than what they are. Also, the overgrowth has given the access tracks a ‘natural look’ – after any maintenance works the track will look different.
Maps showing those access tracks we propose to work on in Spring/Summer 2024 are available under 'Project Documents'.
Public Road Improvement Works
These works include assessing selected public roads with regards to their suitability to accommodate construction traffic. It will take into account the condition of the road, the width and availability of passing places. If found that the road in their current condition is not suitable for construction traffic ‘Public Road Improvement’ works will be undertaken – depending on location and outcome of the assessment this may include work on new and existing passing places, road widenings, road repairs.
We work closely with The Highland Council’s Road Department and in many cases road works undertaken by SSEN Transmission go well beyond the project’s requirements, but also include general improvement works (e.g. pothole repairs).
Traffic management will be required for any roadworks which will be communicated in advance and we will liaise with local communities on any additional measures that will help minimise the impact. Access for key services including emergency access will be provided at all times (even under road closures). All traffic management measures will be discussed and agreed with The Roads Authority and communicated through the appropriate channels.
Ground Investigation / Survey Works
In order to inform the final technical design and proposed approaches ground investigations are required. The nature of ground investigations would range from visual inspection (surveys) to more intrusive ‘core trials’ (bore trials) depending on the location and proposed infrastructure.
The most intrusive ground investigation works are likely to take place at substation locations and proposed underground cable sections.
These works are undertaken with land owner permission and after consultation with statutory organisations (e.g. NatureScot, SEPA, Forest and Land Scotland). Usually these works do not require planning permission but planning consent will be obtained where required. We will also inform local communities where these works have a direct impact on residents.
Drone technology is used in some survey work following the regulations set out in the Air Navigation Order 2016 (as amended) for flying a drone, including privacy considerations.
Temporary Welfare Facilities
Those contractors undertaking works will in some cases be required to set up welfare compounds for their workers, as required by the Health and Safety at Work Act and Construction Design Management Regulations. The sites will also be used as laydown areas for plant and materials.
These compounds will be set up in line with statutory requirements and we will be working with local communities to mitigate any potential negative local impacts.
Project FAQs
FAQs
Register for Project Updates
Your subscription preferences
We would like to send you relevant communications via email, such as invitations to stakeholder events, surveys, updates on projects and future developments. If you are happy to receive email updates, please opt-in by ticking the box on our registration form. You can unsubscribe at any time by contacting us at stakeholder.admin@sse.com, or by clicking the 'unsubscribe' link which appears at the end of our emails.
GDPR
When contacting us, please only submit relevant information. Please do not include sensitive personal data or bank details.
Privacy Notice
For information on how we collect and process your data, please see our Privacy Notice. If you do not have access to the website or would like a hard copy, please contact us.
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.