Overview
June 2025 Public Consultation
We are holding a public consultation event to gain views and feedback for part of our Clash Gour Wind Farm Connection project. For this consultation we will be consulting with the local community and all interested parties and encouraging feedback on our proposals relating to the proposed new Clash Gour substation.
The new substation will be required to enable the power from the windfarm to be transmitted to the grid via the 275kV OHL running between Knocknagel and Blackhillock. SSEN Transmission will now assume responsibility for delivery of the required Clash Gour Substation. As such there is a requirement to undertake a site selection exercise following SSEN Transmission procedures to ensure that the site location is the most appropriate.
Our face to face consultation event will give members of the public an opportunity to view our proposals and speak with members of the project team.
The consultation will be held on:
Date: Tuesday 03 June 2025
Time: 2pm – 7pm
Venue: Edinkillie Hall, Dunphail, Forres, IV36 2QW
This event will be followed by a feedback period, during which all stakeholders are invited to provide feedback specific to the proposals at this stage. We would encourage all members of the local community, and all interested parties to attend the event and meet with our project team who will be there to talk through the details of the project and answer any of your questions. Our consultation period for this project is now open and will close onSubmit your comments and feedback by completing the feedback form on our website or e-mailing or writing to your Community Liaison Manager..
If you are unable to attend this public event you can download the consultation booklet that will be on display from the 'Documents' section of the website.
About the Project
EDF Energy Renewables Ltd have submitted a connection application for their proposed 210MW Clash Gour Wind Farm development, which is located approximately 12km south of Forres in Moray, Scotland. SSEN Transmission will construct a new substation containing two 275/132kV transformers to facilitate the connection to the 275kV system.
We have also proposed to erect two new 275kV towers close to the existing Knocknagael – Blackhillock 275kV double circuit tower line, to facilitate the installation of 275kV tapings. These structures will include down droppers connecting onto new 275kV switchgear located within the substation compound at the Clash Gour 275/132kV Substation.
The aim of the project is to enable renewable energy to connect to our transmission network.
Why is the Project Required?
As part of our statutory and Transmission Licence obligations, we have several duties including:
- The development and maintenance of an efficient, coordinated and economical system of electricity transmission
- To facilitate competition in the supply and generation of electricity
- To ensure that the security of the network is maintained as the demand and/or generation connections change over time
Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.
How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project updates
Featured updates
Featured updates for this project

June 2025 Public Consultation
Project updates
Documents
Project documents
-
Clash Gour Wind Farm Connection Site & Alignment Selection Consultation Document - May 2025.pdf
- Type:
- Date:
- 06 June 2025
- Size:
- 1.1 MB
This Site and Alignment Consultation Document (and associated appendices/maps) explains the project need and summarises the process which has been followed to arrive at the optimal alignment. It forms part of the consultation exercise which provides all interested parties with the opportunity to provide feedback.
-
Clash Gour Wind farm Connection Site Selection Consultation Booklet - June 2025.pdf
- Type:
- Date:
- 21 May 2025
- Size:
- 9.8 MB
This document provides information to our stakeholders about the project and was provided during our consultation in June 2025.
Section 37 covering letter
-
Section 37 covering letter
- Type:
- Date:
- 26 July 2022
- Size:
- 161.8 KB
Section 37 environmental appraisal
-
Section 37 Environmental Appraisal.pdf
- Type:
- Date:
- 27 July 2022
- Size:
- 2 MB
Section 37 figures
-
Figure 1.1 Site Location
- Type:
- Date:
- 26 July 2022
- Size:
- 1.8 MB
-
Figure 1.2 Site Plan
- Type:
- Date:
- 26 July 2022
- Size:
- 3.2 MB
-
Figure 1.3 Environmental Designations
- Type:
- Date:
- 26 July 2022
- Size:
- 4.6 MB
-
Figure 1.4 International Designations
- Type:
- Date:
- 26 July 2022
- Size:
- 8.7 MB
-
Figure 10.1 Cumulative Development
- Type:
- Date:
- 26 July 2022
- Size:
- 1.8 MB
-
Figure 5.1 ZTV and Viewpoint Location
- Type:
- Date:
- 26 July 2022
- Size:
- 2 MB
-
Figure 5.2 Landscape Receptors
- Type:
- Date:
- 26 July 2022
- Size:
- 6.2 MB
-
Figure 5.3 Visual Receptors
- Type:
- Date:
- 26 July 2022
- Size:
- 6.4 MB
-
Figure 5.4 Viewpoint 1 Footpath to Tomnamoon
- Type:
- Date:
- 26 July 2022
- Size:
- 4.3 MB
-
Figure 6.1 Heritage Assets
- Type:
- Date:
- 26 July 2022
- Size:
- 1.8 MB
-
Figure 8.1 Peat
- Type:
- Date:
- 26 July 2022
- Size:
- 1.5 MB
-
Figure 9.1 Forestry Compartments
- Type:
- Date:
- 26 July 2022
- Size:
- 766.5 KB
Section 37 supporting documents
-
Appendix B Species Protection Plans and General Environmental Management Plans
- Type:
- Date:
- 26 July 2022
- Size:
- 8.5 MB
-
Appendix D Cultural Heritage Gazetteer
- Type:
- Date:
- 26 July 2022
- Size:
- 1.1 MB
-
Appendix E Habitats and Protected Species
- Type:
- Date:
- 26 July 2022
- Size:
- 9.7 MB
-
Appendix F Ornithology
- Type:
- Date:
- 26 July 2022
- Size:
- 9.6 MB
FAQs
FAQs
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.