Overview
Clash Gour and Ourack Windfarm Connection Consultations
We invite you to attend our public consultation event for two proposed electricity network projects in the Forres area:
• Clash Gour Windfarm Connection
• Ourack Windfarm Connection
These are separate projects, but consultation events for both projects will take place at the same venue on the same day.
Date: Tuesday 10 November 2026
Time: 2 - 7pm
Venue: Edinkillie Hall, Dunphail, Forres, IV36 2QW
We are carrying out the first of two Pre-Application Consultation (PAC1) events for each project and are seeking feedback from the local community and stakeholders before progressing our plans.
The Clash Gour consultation will focus on proposals for:
• A new electricity substation required to connect the proposed Clash Gour Wind Farm to the transmission network.
• Associated overhead line works required to link the new substation into the existing electricity network.
The Ourack consultation will focus on our route options for connecting the proposed Ourack Wind Farm to the transmission network.
At the event we will present both overhead line and underground cable route options.
Our current preferred route is a wholly underground cable connection and we are particularly interested in hearing your views on this proposal and the route options under consideration.
The project team will be available to explain the proposals, answer questions and discuss how feedback will help inform the development of the projects.
Can't make it in person? You can still explore useful project information in our virtual consultation room from the link below, or download the event materials from the documents section.
Click here for the virtual consultation.
To see the project from different viewpoints, please click the link below.
About the Project
EDF Energy Renewables Ltd have submitted a connection application for their proposed 210MW Clash Gour Wind Farm development, which is located approximately 12km south of Forres in Moray, Scotland. SSEN Transmission will construct a new substation containing two 275/132kV transformers to facilitate the connection to the 275kV system.
We have also proposed to erect two new 275kV towers close to the existing Knocknagael – Blackhillock 275kV double circuit tower line, to facilitate the installation of 275kV tapings. These structures will include down droppers connecting onto new 275kV switchgear located within the substation compound at the Clash Gour 275/132kV Substation.
The aim of the project is to enable renewable energy to connect to our transmission network.

Why is the Project Required?
As part of our statutory and Transmission Licence obligations, we have several duties including:
- The development and maintenance of an efficient, coordinated and economical system of electricity transmission
- To facilitate competition in the supply and generation of electricity
- To ensure that the security of the network is maintained as the demand and/or generation connections change over time

Community Engagement
Throughout the life of our projects, we aim to work positively with local communities and keep people informed about what we are doing. This is particularly important when we are developing a proposal and we want to understand what local people think about our plans.
We endeavour to take the time to discuss proposals with local community councils, encourage engagement from the wider community and listen to the feedback we receive.
We will do our best to answer any questions and address issues or concerns that are raised with us.
When our project progresses into construction, we will continue working closely with the local community to ensure that our work has as little impact on the lives of those living and working in the area and as many long term positive effects as possible.

How we’re embracing artificial intelligence (AI)
We intend to use AI to assist our experienced teams in the analysis of your feedback, so we can categorise key points raised more quickly. You can learn more about how we’re utilising AI on this dedicated web page.
Project updates
Featured updates
Featured updates for this project
Clash Gour & Ourack Windfarm Connections - Pre Application Consultation Event
Project updates
Documents
Consultation 2026
Project Consultation Documents
FAQs
FAQs
Recite me
To make use of this function please click on the 3 'A's' button at the bottom left of the website.