Breadcrumb
  1. Home
  2. Sitemap
  • Home
    • What We Do
      • What We Do
      • Innovation
      • Our Supply Chain
        • Linxon
        • NKT
        • Tulloch Developments
        • Orkney Link
        • Highland Blindcraft
        • BAM
        • Balfour Beatty
        • Murphy
        • Hitachi Energy
        • Siemens Energy
        • Sumitomo
        • Painter Brothers
        • Had-Fab
      • Whole System Hub
      • Sustainability
      • 2026 Economic Report
      • Stakeholder Engagement
        • AA1000 Stakeholder Engagement Standard
        • Infrastructure Stakeholder Engagement Survey
        • Register as a Stakeholder
      • Careers
        • Early careers programmes at SSEN Transmission
      • Digital Strategy and Action Plan
      • Asset Management
      • Helping you work safely near our network
      • Financial Information
        • Charging statements and information
    • Customer Connections
    • Projects
      • Project Map
        • Aberarder Wind Farm Connection
        • Abernethy Substation Extension
        • Abhainn Dubh Wind Farm Connection
        • Achany Wind Farm Extension Connection
        • Alyth 400kV Substation
        • Alyth - Tealing Overhead Line 400kV Upgrade
        • An Suidhe Substation
        • Arbroath GSP Upgrade
        • Argyll and Kintyre 275kV Strategy
        • Argyll and Kintyre 275kV Substations
        • Balallan Switching Station
        • Banniskirk Hub (400kV substation and HVDC converter station)
        • Beauly - Peterhead 400kV OHL
        • Beauly Denny 400kV Upgrade
        • Beauly - Inverness - Keith
        • Beauly 132kV Reinforcement Project
        • Beinn Tharsuinn Wind Farm Connection
        • Bhlaraidh Extension Windfarm Connection
        • Bingally 400kV Substation
        • Blackhillock 275kV AC Power Flow Control
        • Blackhillock – Keith – Macduff 132kV Reinforcement
        • Blackhillock Substation
        • Blarghour Wind Farm Connection Project
        • Caithness HVDC Switching Station
        • Caithness - Moray
        • Cambushinnie 400kV Substation
        • Carnaig 400kV substation
        • Carn Fearna Wind Farm Connection
        • Carradale Substation
        • Chleansaid Wind Farm Connection
        • Clash Gour Wind Farm Connection
        • Coire Glas Connection Project
        • Corriegarth
        • Corriemoillie Substation Extension
        • Corshellach Substation (Berryburn Extension)
        • Craig Murrail Substation
        • Craigiebuckler to Woodhill Underground Cable Replacement
        • Crarae Substation
        • Creag Dhubh - Dalmally 275kV Connection
        • Creag Dhubh - Inveraray 275kV Overhead Line
        • Creag Dhubh Substation
        • Creag Riabhach wind farm connection
        • Crossaig Substation
        • Dorenell wind farm connection
        • Dundee Strategic Spares Warehouse
        • Dunoon Overhead Line Rebuild Project
        • Dunoon 132kV Substation Replacement
        • Earraghail Wind Farm Connection Project
        • East Coast 275kV OHL Upgrade
        • East Coast 400kV OHL Upgrade
        • Eastern Green Link 2
        • Eastern Green Link 3
        • Eastern Green Link 5
        • Eday
        • Elchies (Rothes III) Wind Farm Grid Connection
        • Elgin Substation
        • Elmwood – Glenagnes 132kV UGC Replacement
        • Emmock 400kV Substation
        • Errochty GSP
        • Fasnakyle to Bingally 132kV Connection
        • Fetteresso 132kV substation Upgrade
        • Fetteresso 400kV Upgrade
        • Fort Augustus - Fort William
        • Fort Augustus Substation 400kV Upgrade
        • Foyers Substation Works
        • Garvary Wind Farm Connection
        • Gills Bay Radial
        • Glen Kyllachy Wind Farm Connection
        • Glenmoriston GT Replacement
        • Glendye Windfarm Connection
        • Greens 400kV Substation
        • Gremista GSP (Grid Supply Point) and 132kV Connection
        • Harris – Stornoway 132kV OHL
        • High Constellation
        • Highland Wind Farm Connection
        • Hurlie 400kV Substation
        • Inveraray - Crossaig 275kV Overhead Line Project
        • Inverness Strategic Spares Warehouse
        • Keith Substation Upgrade
        • Kellas Wind Farm Connection
        • Kinardochy – Errochty Underground Cable
        • Kinardochy Substation
        • Kintore 132kV Asset Replacement
        • Kintore 400kV Substation
        • Kintore-Tealing 400kV OHL Connection
        • Kintradwell Wind Farm Connection
        • Knocknagael - Tomatin
        • Lairg II Wind Farm Connection
        • Lairg - Loch Buidhe
        • Lerwick House
        • Limekiln wind farm connection
        • Loch Buidhe substation
        • Loch Fearna PSH Connection
        • Lochay 132/11kV Transformer Replacement
        • Loch Kemp Pumped Hydro Storage Scheme 275kV Grid Connection
        • Loch na Cathrach (formerly Red John Pump Storage Scheme 275kV Connection)
        • Lunanhead Grid Transformer Replacement
        • Melgarve Cluster
        • Muaitheabhal Wind Farm Connection
        • New Coire Mashie 400kV Substation and Earba PSH Connection
        • New Coupar Angus 132kV Substation
        • New Deer Substation
        • New Deer Substation Extension
        • New Fanellan 400kV substation and Converter Station
        • New Fiddes 132kV substation
        • New Strathy Switching Station
        • Netherton Hub
        • Netherton Hub 400kV Overhead Line Connection to New Deer and Peterhead Rebuild
        • Netherton Hub 400kV Overhead Line Connection to New Deer and Peterhead - Tie-in Connection
        • North East 400kV
        • Northern Shetland 220kV to Kergord 132kV Overhead Line
        • Orkney
        • Peterhead - Persley – Kintore 400kV Upgrade
        • Peterhead Substation
        • Peterhead Substation Upgrade
        • Peterhead Super Grid Transformer Replacement
        • Peterhead to Inverugie 132kV overhead line works
        • Quoich Reinforcement Project
        • Quoich Power Station to Switching Station OHL Replacement
        • Quoich to Aberchalder 132kV Reinforcement Project
        • Redmoss to Clayhills Underground Cable Replacement
        • Rothienorman Substation
        • Sallachy Wind Farm Connection
        • Sheirdrim Wind Farm Connection
        • Shetland HVDC Link
        • Shetland HVDC link 2
        • Shin Substation
        • Shin to Loch Buidhe 132kV Overhead Line Rebuild
        • Slickly Wind Farm Connection
        • Skye Reinforcement
        • Sloy Power Station Transformer Replacement Project
        • Sloy to Windyhill OHL Refurbishment Project
        • South Formartine 400 / 132kV Substation
        • Spittal – Loch Buidhe – Beauly 400kV Connection
        • Spittal to Peterhead Subsea Cable Link
        • Stannergate 132kV Substation and Network Rail Feeder Station
        • St Fergus Substation
        • Stornoway Grid Supply Point (GSP) Upgrade
        • Stornoway Wind Farm Connection
        • Strategic Spares Warehouses
        • Strathy North to Connagill 275kV overhead line
        • Strathy Wood Wind Farm Connection
        • Tangy IV Wind Farm and Cnoc Buidhe Wind Farm Shared Use 132kV Connection Project
        • Taynuilt - Creag Dhubh Reinforcement
        • Tealing-Arbroath 132kV Overhead Line
        • Tealing - Westfield Overhead Line 400kV Upgrade
        • Tealing Substation Extension
        • Tomatin Substation Extension
        • Tomchrasky Wind Farm Connection
        • VISTA - Boat of Garten to Nethy Bridge
        • VISTA - Glen Falloch & Sloy
        • VISTA - Glen Strathfarrar
        • VISTA - Killin
        • Western Isles HVDC Link Project
        • West of Beauly - Asset Replacement Projects
        • Willowdale GSP
      • Project Search
      • Projects delivering a Network for Net Zero - Pathway to 2030
        • Pathway to 2030 FAQs
    • Events
    • News & Views
    • Information Centre
      • Open Data Portal
      • Working with Landowners
      • Transmission Price Control Review
      • How we're embracing artificial intelligence (AI)
      • Community Benefit Funding
        • Discover our funds
          • Bingally Local Fund
          • North Aberdeenshire Local Fund
          • Aberarder Local Fund
          • Lewis Hub Local Fund
          • Shetland HDVC Link Fund
          • Eastern Green Link 2 Peterhead Local Fund
          • Argyll and Kintyre 275kV Local Fund
          • Regional Fund
          • Skye Reinforcement Local Fund
        • Our approach to Community Benefit Funding
        • Case studies
      • Housing Strategy
      • Transforming the grid to secure our energy future
      • Our RIIO-T3 Business Plan
      • Volunteering in Local Communities
    • Contact Us

Explore our Social Media

  • LinkedIn (opens in new window)
  • Instagram (opens in new window)
  • Facebook (opens in new window)

Useful Links

Contact Us

Careers

Media

Accessibility

Website feedback

Policies/Notices

Modern slavery statement

Privacy notice

Cookie notice

SSE.com

Emergency Contact

Power cut? Call 1-0-5

Company Information

Copyright © 2026 SSEN Transmission is the trading name of Scottish Hydro Electric Transmission plc
All rights reserved.

Scottish and Southern Electricity Networks is a trading name of: Scottish and Southern Energy Power Distribution Limited Registered in Scotland No. SC213459; Scottish Hydro Electric Transmission plc Registered in Scotland No. SC213461; Scottish Hydro Electric Power Distribution plc Registered in Scotland No. SC213460; (all having their Registered Offices at Inveralmond House 200 Dunkeld Road Perth PH1 3AQ); and Southern Electric Power Distribution plc Registered in England & Wales No. 04094290 having their Registered Office at No. 1 Forbury Place 43 Forbury Road Reading RG1 3JH which are members of the SSE Group www.ssen-transmission.co.uk